DA-88-22-2 -- Performance Monitoring Results for an Office Building Groundwater Heat Pump System PDF

DA-88-22-2 -- Performance Monitoring Results for an Office Building Groundwater Heat Pump System PDF

Name:
DA-88-22-2 -- Performance Monitoring Results for an Office Building Groundwater Heat Pump System PDF

Published Date:
1988

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Results of a 20-month performance monitoring project on a groundwater source heat pump system installed in a 12,500 ft2 (1,161 m2) office building are reviewed. The open-loop groundwater source heat pump system serves as the central plant for a 14-zone, internal water,loop heat pump system.

Intensive monitoring of the open-loop groundwater central plant during phase 1 of the project showed a heating mode seasonal performance factor of 2. Results for phase 1 cooling mode showed a seasonal average COP of 37 (EER 127). These cooling results are superior when compared to alternative cooling systems such as a spray cooler or cooling tower, typically used as the central plant.

A second water source heat pump was added during Phase 2. Results for phase 2 heating mode show that a seasonal performance factor of 3.0 was obtained for the improved central plant. The second water source heat pump replaced a backup electric water heater previously used for the second stage of heating.

Results of economic analysis show a simple ,payback of two to three years when this open-loop water source heat pump system is compared to a conventional central plant consisting of an electric boiler and cooling tower. The system does not have a payback when compared to oil or gas systems at current prices. The second heat pump added in phase 2 has a 0.8 year payback period compared to the phase I system.

The authors conclude that an open-loop groundwater heat pump system as a central plant is competitive with all-electric systems in small commercial buildings.

Units: Dual


File Size : 1 file , 1.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 17
Product Code(s) : D-DA-88-22-2
Published : 1988

History


Related products


Best-Selling Products

GPA 101-43
Published Date: 01/01/1994
Standard Compression and Charcoal Tests for Determining the Natural Gasoline Content of Natural Gas
$13.5
GPA 1167-83
Published Date: 1983
GPA Glossary - Definition of Words and Terms Used in the Gas Processing Industry
$16.5
GPA 181-86
Published Date: 01/01/1986
Tentative Reference Bulletin Heating Value as a Basis for Custody Transfer of Natural Gas
$19.5
GPA 194-94
Published Date: 1994
Tentative NGL Loading Practices
$16.5
GPA 2103-20 Errata (July 2021)
Published Date: 2021
Errata (July 2021) to Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
Free Download
GPA 2103-20
Published Date: 2020
Method for the Analysis of Natural Gas Condensate Mixtures Containing Nitrogen and Carbon Dioxide by Gas Chromatography
$16.5