Development of Baseline Building Energy Models for the Advanced Occupant-Centric Building Control Research in the Various U.S. Climates PDF

Development of Baseline Building Energy Models for the Advanced Occupant-Centric Building Control Research in the Various U.S. Climates PDF

Name:
Development of Baseline Building Energy Models for the Advanced Occupant-Centric Building Control Research in the Various U.S. Climates PDF

Published Date:
2020

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
This study refines the existing large and medium office models from the U.S. DOE Commercial Prototype Building Models (CPBM) to accommodate the purpose of occupant-centric control (OCC) implementation and evaluation. Firstly, a detailed rezoning plan was created to add the zoning diversity (e.g., closed office, open office, conference room) to the original medium and large office models in the CPBM. Next, a unique set of dynamic occupancy schedules were generated using a statistical tool for each room to represent the occupancy variation. Then, two OCC cases were generated utilizing the occupancy presence sensing and occupant counting technologies. Finally, the refined models were extended to different versions of ASHRAE standards (e.g., ASHRAE Standard 90.1-2004, 2007 and 2010) and various U.S. climate zones following the code requirement. The simulation results suggested that the presented OCCs could achieve huge energy savings for the HVAC system, especially in cold climates.
File Size : 1 file , 3.3 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-BSC20-C064
Published : 2020

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138