Emerging Technologies: Air-To-Air Energy Recovery Heat Exchangers PDF

Emerging Technologies: Air-To-Air Energy Recovery Heat Exchangers PDF

Name:
Emerging Technologies: Air-To-Air Energy Recovery Heat Exchangers PDF

Published Date:
2003

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$2.7
Need Help?

This is the sixth article covering a new energy-saving technology evaluated in a recent U.S. Department of Energy report, which is available at www.eren.doe.gov/buildings/documents.

Air-to-air energy recovery heat exchangers (ERHXs) include heat recovery ventilators (HRVs) and energy recovery ventilators (ERVs). They are placed in ventilation units, unitary air conditioners, and air-handling units that take in outdoor air (OA) while venting indoor air (Figure 1). Exhaust air from the building interior passes through one side of the exchanger, counter flow to the incoming makeup air, which passes through the other side of the exchanger. During the cooling season, the (cooler) indoor air precools the incoming OA. The transfer of heat reverses during the heating season, i.e., the exchanger transfers heat from the warmer indoor air to preheat the incoming OA. The heat exchanger may transfer sensible heat only (HRV) or both sensible and latent heat (ERV). Typical heat and enthalpy exchange efficiencies range from 55% to almost 80%.1 ARI Standard 1060 and ASHRAE Standard 84 form the basis for rigorous performance ratings of ERHXs.


File Size : 1 file , 600 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 2
Product Code(s) : D-17672
Published : 2003

History


Related products


Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7