Emerging Technologies: Using Off-Peak Precooling PDF

Emerging Technologies: Using Off-Peak Precooling PDF

Name:
Emerging Technologies: Using Off-Peak Precooling PDF

Published Date:
2009

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$2.7
Need Help?

A building precooling operational strategy cools the building prior to peak demand periods to reduce space cooling loads during peak demand periods. This strategy is analogous to chilled-water or ice-based thermal energy storage approaches using the building’s thermal mass to store “coolness” instead of chilled water or ice.

Units: Dual

 


File Size : 1 file , 140 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 4
Product Code(s) : D-AJ09MarET
Published : 2009

History


Related products


Best-Selling Products

SN-INSTA/TR 951:2019
Published Date: 10/03/2019
Fire Safety Engineering - Guide for Probabilistic Analysis for Verifying Fire Safety Design in Buildings