Facility Information Systems for Post-Occupancy Commissioning PDF

Facility Information Systems for Post-Occupancy Commissioning PDF

Name:
Facility Information Systems for Post-Occupancy Commissioning PDF

Published Date:
2006

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$2.7
Need Help?

The process of building commissioning and facility optimization is evolving with advancements in facility information technology. This article presents a case study of a project at the David Skaggs Research Center in Boulder, Colo., where building automation system (BAS) data and spreadsheet analysis techniques were used to identify operational problems, opportunities for increased efficiency and other improvements in the post-occupancy phase during the first year following construction.


File Size : 1 file , 380 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 7
Product Code(s) : D-28038
Published : 2006

History


Related products


Best-Selling Products

SN-INSTA/TS 950:2014
Published Date: 04/30/2014
Fire Safety Engineering - Comparative method to verify fire safety design in buildings
SN-INSTA/TS 952:2019
Published Date: 08/20/2019
Fire Safety Engineering - Review and Control in the Building Process