Feasibility Assessment for Retrofitting an Energy-Efficient Hospital Building through Energy Modelling and Field Investigation PDF

Feasibility Assessment for Retrofitting an Energy-Efficient Hospital Building through Energy Modelling and Field Investigation PDF

Name:
Feasibility Assessment for Retrofitting an Energy-Efficient Hospital Building through Energy Modelling and Field Investigation PDF

Published Date:
2018

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
The objective of this study, including field investigations and energy modelling, is to evaluate the feasibility of retrofit for energy performance of a hospital in Taiwan. This hospital consumes around 8500000 kWh annually with 37490 m2 floor area including twelve stories and two floors of basements. The current facility systems of this hospital present relevant signs of degradation and obsolescence with high energy consumption. The retrofitting plan of facility systems for this hospital is assessed and conducted to improve energy performance accordingly. Based on ASHRAE procedures for commercial building energy audits (PCBEA), field study and energy audits were conducted to collect information of building geometry, building materials, space types, density and activities of people, capacity of HVAC system, loads and operating schedules of lighting and other facilities. The energy consumption baseline can be derived through PCBEA and BEMS (building energy management system) data. Energy modelling using Energy Plus code has been conducted extensively to evaluate the energy saving approaches. The results reveal that the energy saving strategy of increasing chiller water supply temperature 1℃ could obtain 1% of annual energy saving, while increasing room set point 1℃ may reach 2% saving of annual energy consumption. Besides, applying the insulation film for glass also presents about 0.8% of annual energy saving through energy modelling. The retrofit feasibility has also been evaluated in terms of annual savings and pay-back period of the investment. The procedural investigation of building energy consumption should provide valuable information for facility engineers facing energy saving concerns.
File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 8
Product Code(s) : D-ICEB18-C030
Published : 2018
Units of Measure : Dual

History


Related products


Best-Selling Products

ICEA P-117-734-2016
Published Date: 02/23/2016
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$90
ICEA P-117-734-2022
Published Date: 07/06/2022
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$96
ICEA P-123-739-2018
Published Date: 01/18/2018
GUIDE TO ESTABLISH ELECTRICAL TEST METHODS FOR NON-CONDUCTING JACKET MATERIALS FOR POWER CABLES RATED 5 TO 500 KV
$22.5
ICEA P-124-736-2021
Published Date: 06/03/2021
Code Words for 600 Volt Underground Distribution Cables
$13.5
ICEA P-127-737-2021
Published Date: 06/03/2021
Code Words for Overhead Aluminum Covered Conductors and 600 Volt Overhead Cables
$13.5
ICEA P-136-726-2024
Published Date: 2024
Guide for Pellet Inspection Systems for Unfilled Power Cable Insulation Compound
$29.1