Name:
Guideline 1.5-2017 -- The Commissioning Process for Smoke Control Systems PDF
Published Date:
2017
Status:
Active
Publisher:
ASHRAE
ASHRAE Guideline 1.5 relates how to apply the Commissioning (Cx) Process, described in ASHRAE Guideline 0 and ASHRAE Standard 202, to all types and sizes of smoke control systems.
| File Size : | 1 file , 590 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 32 |
| Product Code(s) : | D-86841, 86841 |
| Published : | 2017 |
| Redline File Size : | 2 files , 6.3 MB |
| Units of Measure : | Dual |