IN-91-10-3 -- An Experimental Study of the Control of Radiant Floor Heating Systems - Proportional Flux Modulation vs. Outdoor Reset Control with Indoor Temperature Offset PDF

IN-91-10-3 -- An Experimental Study of the Control of Radiant Floor Heating Systems - Proportional Flux Modulation vs. Outdoor Reset Control with Indoor Temperature Offset PDF

Name:
IN-91-10-3 -- An Experimental Study of the Control of Radiant Floor Heating Systems - Proportional Flux Modulation vs. Outdoor Reset Control with Indoor Temperature Offset PDF

Published Date:
1991

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Notes that general understanding that floor heating supply water temperature should be varied in accordance with outdoor temperature due to the time lag between thermostat demand and heat delivery to the space. However notes the recent concept of proportional flux modulation, with flux, not the temperature being controlled, because the rate at which energy enters the slab is correlated with the supply/return water temperature difference, not with the supply water temperature. States that to evaluate these issues, two identical thermal test chambers were constructed and separate control systems installed in each chamber. Comparative analysis was then conducted through physical experiments in a laboratory setting. States the results show that both control systems are competitive in maintaining stable indoor temperatures. Proportional flux modulation shows faster response to certain thermal transients than does outdoor reset control with indoor temperature offset.

KEYWORDS: Floor heating, radiant heating, experiment, laboratory testing, controls, water temperature, water flow, supply temperature, outdoor temperature, temperature difference


File Size : 1 file , 990 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-18301
Published : 1991

History


Related products


Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
$17.7
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
$15.3
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
$17.7
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
$31.8
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
$68.4
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
$22.2