LB-07-016 -- Enhancement and Use of Combined Simulation Tools in the Assessment of Hybrid Natural/Mechanical Ventilation Systems PDF

LB-07-016 -- Enhancement and Use of Combined Simulation Tools in the Assessment of Hybrid Natural/Mechanical Ventilation Systems PDF

Name:
LB-07-016 -- Enhancement and Use of Combined Simulation Tools in the Assessment of Hybrid Natural/Mechanical Ventilation Systems PDF

Published Date:
2007

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

A design team tasked with creating a carbon neutral building in central Wisconsin needed to assess techniques for minimizing the energy use associated with the building’s HVAC systems, especially its ventilation system. Nonventilation building thermal loads are met with radiant slabs while carbon dioxide sensors allow adjustment of ventilation flow rates within the space. The ventilation system includes both mechanical and natural operational modes, as well as ancillary pretreatement devices such as earth ducts and energy recovery ventilators. An existing connection between an integrated building energy simulation tool and a multizone bulk airflow modeling tool was enhanced to allow the airflow tool to dynamically respond to control signals (such as changes in window opening area) sent by the building energy tool during the course of annual simulations. Building on experimental validation of the bulk flow model’s ability to reasonably predict the performance of natural ventilation systems and relying on the use of transparent and flexible simulation tools, the integrated model allowed the design team to explore the impacts of natural ventilation control strategies (purely mechanical, purely occupant-controlled, and occupant control with humidity lockout controls) as well as the interaction of those strategies with the performance of the mechanical ventilation systems and to develop control recommendations that allow the building to operate in its natural ventilation mode during 20% of the building’s annual occupied hours.

Units: Dual


File Size : 1 file , 2.9 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-LB-07-016
Published : 2007

History


Related products


Best-Selling Products

VDI/VDE/DGQ 2618 Sheet 1.1
Published Date: 12/01/2001
Inspection of measuring and test equipment - Instructions to inspect measuring and test equipment for geometrical quantities - Basic principals
VDI/VDE/DGQ 2618 Sheet 1.2
Published Date: 12/01/2003
Inspection of measuring and test equipment - Instructions for the inspection of measuring and test equipment for geometrical quantities - Uncertainty of measurement
VDI/VDE/DGQ 2618 Sheet 10.1
Published Date: 11/01/2001
Inspection of measuring and test equipments - Test instructions for micro meters
VDI/VDE/DGQ 2618 Sheet 10.2 - DRAFT
Published Date: 07/01/2005
Draft Document - Inspection of measuring and test equipment - Test instruction for micro meters for screw thread measurement
VDI/VDE/DGQ 2618 Sheet 10.2
Published Date: 04/01/2010
Inspection of measuring and test equipment - Test instruction for micrometers for screw thread measurement and other measurement purposes
VDI/VDE/DGQ 2618 Sheet 10.3
Published Date: 08/01/2002
Inspection of measuring and test equipment - Test instructions for micro meters with dial indicator