LV-22-C063 - Five Years Later: Second Round Institutional Energy Retrofit Analysis Procedure PDF

LV-22-C063 - Five Years Later: Second Round Institutional Energy Retrofit Analysis Procedure PDF

Name:
LV-22-C063 - Five Years Later: Second Round Institutional Energy Retrofit Analysis Procedure PDF

Published Date:
2022

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?
This paper provides a continuation of the results and efforts to continuously maintain and use a fleet of 120 detailed Building Energy Models (BEM) ofthe Sandia National Laboratories New Mexico and California sites. The fleet has continued to be used in new applications beyond its 1st round of sitewideenergy retrofit and climate assessments in 2014-2017. These include resilient energy systems assessments in 2018-2019 and institutional peak electricload characterization in 2020. The most recent work is a 2nd round site-wide energy retrofit assessment that is being planned. This paper shows the 10step procedure planned for this 2nd assessment and contrasts it to the 1st round of institutional energy retrofit analyses. The procedure involves calculatingdifference metrics between the various steps in the procedure that highlight the accuracy of the energy retrofit decisions being made. Here, energy retrofitdecisions involve deciding what specific building and energy retrofit is the next best choice based on metrics such as total energy saved, carbon offset, or energycost savings minus the energy retrofit implementation cost. The first difference metric delta 11 assesses the robustness of energy retrofit decisions with respect tohistorical, climate change, and extreme event weather futures, the second delta 15 assesses the robustness of energy retrofit decisions by comparing results beforeand after BEM calibration. This provides information that helps to show if the retrofit is very sensitive to other BEM input parameters that are alsouncertain. The third metric delta 19 involves empirical validation of energy savings or other metrics used based on actual metered results. A demonstration ofcalculating delta 11 shows how important climate and future weather is to energy retrofit decisions for a 96 BEM study with 2 energy retrofits involving roofinsulation and external wall insulation. Weather files for 2017-2020, Typical Meteorologic Year 3 (TMY3), and 3 extreme event scenarios were includedfor different weather futures. The results show that variations in energy savings are significant and the optimal decision set with baseline year 2020 is onlystable to 30 decisions of the 192 potential energy retrofit decisions. This shows that using a single weather future is likely to lead to sub-optimal choices.
File Size : 1 file , 3.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 9
Product Code(s) : D-LV-22-C063
Published : 2022
Units of Measure : Dual

History


Related products


Best-Selling Products

BS ISO/IEC ISP 10607-1:1995
Published Date: 03/15/1997
Information technology. International standardized profiles AFTnn. File transfer, access and management-Specification of ACSE, presentation and session protocols for the use by FTAM
$57.15
BS ISO/IEC ISP 10608-14:1995
Published Date: 12/15/1995
Information technology. International standardized profile TAnnnn. Connection-mode transport service over connectionless-mode network service-MAC, PHY and PMD sublayer dependent and Station Management requirements over an FDDI LAN subnetwork
$79.248
BS ISO/IEC ISP 10608-5:1992
Published Date: 03/15/1994
Information technology. International standardized profile TAnnnn. Connection-mode transport service over connectionless-mode network service-TA1111/TA1121 profiles including subnetwork-dependent requirements for X.25 packet-switched data networks using virtual calls
$48.006
BS ISO/IEC ISP 10609-1:1992
Published Date: 01/15/1993
Information technology. International standardized profiles TB, TC, TD and TE. Connection-mode transport service over connection-mode network service-Subnetwork-type independent requirements for Group TB
$57.15
BS ISO/IEC ISP 10609-5:1992
Published Date: 01/15/1993
Information technology. International standardized profiles TB, TC, TD and TE. Connection-mode transport service over connection-mode network service-Definition of profiles TB1111/TB1121
$28.194
BS ISO/IEC ISP 10614-1:1995
Published Date: 11/15/1995
Information technology. International standardized profile RC. X.25 protocol relaying-Subnetwork-independent requirements
$57.15