OR-05-11-1 - Cost-Effective Design of Dual Heat and Energy Recovery Exchangers for 100% Ventilation Air in HVAC Cabinet Units PDF

OR-05-11-1 - Cost-Effective Design of Dual Heat and Energy Recovery Exchangers for 100% Ventilation Air in HVAC Cabinet Units PDF

Name:
OR-05-11-1 - Cost-Effective Design of Dual Heat and Energy Recovery Exchangers for 100% Ventilation Air in HVAC Cabinet Units PDF

Published Date:
2005

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper shows how a combined air-to-air heat and energy recovery system design problem can be formulated for HVAC cabinet units and solved for the least life-cycle cost system while still retaining a small time period payback. Mathematical expressions are presented to address the complicating interaction between the components of the unit to facilitate the design process. The design process is illustrated for the city of Chicago where both large heating and cooling loads occur in HVAC applications. The example design problem presented shows that payback periods of a little over a year are often achieved for retrofitted units, and the life-cycle cost savings for auxiliary heating and cooling ventilation air far exceeds the capital cost even when only a 10-year life cycle is considered.

Units: SI


File Size : 1 file , 970 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 16
Product Code(s) : D-25597
Published : 2005

History


Related products


Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36