Name:
OR-94-19-3 -- Legal Aspects of Building Commissioning - Claim Avoidance PDF
Published Date:
1994
Status:
Active
Publisher:
ASHRAE
Outlines how the revised ASHRAE Guideline for Commissioning of HVAC Systems can be used to reduce, if not avoid, claims arising out of the design, installation and start-up of HVAC systems. Uses recently concluded litigation involving a HVAC system as a case study to provide concrete examples of how the guideline could have eliminated mistakes made by all participants in the construction process.
KEYWORDS: USA, legal practice, case studies, buildings, commissioning, regulations, heating, ventilation, air conditioning, designing, installing, starting
| File Size : | 1 file , 1.3 MB |
| Note : | This product is unavailable in Russia, Belarus |
| Product Code(s) : | D-17690 |
| Published : | 1994 |