OT-88-18-2 -- DDC Systems for Pressurization, Fume Hood Face Velocity and Temperature Control in Variable Air Volume Laboratories PDF

OT-88-18-2 -- DDC Systems for Pressurization, Fume Hood Face Velocity and Temperature Control in Variable Air Volume Laboratories PDF

Name:
OT-88-18-2 -- DDC Systems for Pressurization, Fume Hood Face Velocity and Temperature Control in Variable Air Volume Laboratories PDF

Published Date:
1988

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Various design concepts for fume hood face velocity control, space pressurization, and temperature control in VAV laboratories are discussed. Tracking and differential pressure control designs are contrasted as are sash/flow and side wall velocity-sensing methods of face velocity control. Suggestions as to methods of computer hardware performance evaluation are also given.

Units: I-P

 


File Size : 1 file , 1.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 22
Product Code(s) : D-OT-88-18-2
Published : 1988

History


Related products


Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1