PERSIST-Pressure Equalized Rain Screen Insulated Structure Technique-Design Approach PDF

PERSIST-Pressure Equalized Rain Screen Insulated Structure Technique-Design Approach PDF

Name:
PERSIST-Pressure Equalized Rain Screen Insulated Structure Technique-Design Approach PDF

Published Date:
1998

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Many buildings have problems with the performance and durability of their envelopes largely related to inadequate control of air leakage. The discovery of the shortcomings in achieving the expected performance is often only realized when the building is in operation, even though many problems can often be predicted simply by review of the construction documents. Buildings with envelope problems are rarely in imminent danger of collapse, but by not fulfilling their intended purpose and increased operating and repair costs, they can become a liability. Building owners and operators are further affected by litigation over comfort, health, and safety issues. The Pressure Equalized Rain Screen Insulated Structure Technique, PERSIST, is recommended by Alberta Public Works in the design of new buildings. This approach is also recommended for the retrofit of existing buildings with serious envelope problems. This paper discusses the PERSIST design concept and some of the construction details and methods that enhance its application.

AUTHOR: Chris B. Makepeace, Barrie T. Dennis
CITATION: Thermal Performance of the Exterior Envelopes of Buildings VII
KEYWORDS: December, Florida, 1998
YEAR: 1998


File Size : 1 file , 150 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-8052
Published : 1998

History


Related products


Best-Selling Products

CPSC 16 CFR PART 1130
Published Date: 01/01/2018
REQUIREMENTS FOR CONSUMER REGISTRATION OF DURABLE INFANT OR TODDLER PRODUCTS
$9.3
CPSC 16 CFR PART 1209
Published Date: 01/01/2018
INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION
$12
CPSC 16 CFR PART 1220
Published Date: 01/01/2019
SAFETY STANDARD FOR NON-FULL-SIZE BABY CRIBS
$8.7
CPSC 16 CFR PART 1250
Published Date: 01/01/2022
SAFETY STANDARD MANDATING ASTM F963 FOR TOYS
$8.4
CPSC 16 CFR PART 1250
Published Date: 01/01/2023
SAFETY STANDARD MANDATING ASTM F963 FOR TOYS
$8.4
CPSC 16 CFR PART 1250
Published Date: 01/01/2024
SAFETY STANDARD MANDATING ASTM F963 FOR TOYS
$8.4