QC-06-001 (RP-1311) - Solar Absorption by Each Element in a Glazing/Shading Layer Array PDF

QC-06-001 (RP-1311) - Solar Absorption by Each Element in a Glazing/Shading Layer Array PDF

Name:
QC-06-001 (RP-1311) - Solar Absorption by Each Element in a Glazing/Shading Layer Array PDF

Published Date:
2006

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Window solar gain can strongly influence building energy consumption and peak cooling load. Shading devices such as venetian blinds, roller blinds, and drapes are routinely used to control solar gain. There is a strong need for models that allow shading layers to be included in glazing system analysis. This paper presents methods by which existing solar optical models for systems of specular glazing layers can be extended to include the effect of layers that create scattered, specifically diffuse, radiation in reflection and/or transmission. Spatially averaged optical properties (i.e., “effective” optical properties) can be used to characterize shading layers, including their beam-diffuse split. Solution techniques can be formulated on the basis of matrix reduction. However, an alternative technique has been developed with the goal of computational simplicity and speed. These attributes are important in the context of hour-by-hour building energy analysis. Sample calculations are presented.


File Size : 1 file , 1.9 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-28722
Published : 2006

History


Related products


Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36