QC-06-017 - Chilled Water Plant Retrofit -- A Case Study PDF

QC-06-017 - Chilled Water Plant Retrofit -- A Case Study PDF

Name:
QC-06-017 - Chilled Water Plant Retrofit -- A Case Study PDF

Published Date:
2006

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper outlines a phased retrofit plan for the central chilled water plant at Sonoma State University. The plant has experienced many operational problems and is composed of equipment (chillers, pumps) that has operated well beyond its expected service life. Furthermore, the campus master plan calls for the addition of several future buildings that will tax the already marginal capacity of the system. The retrofit plan, which includes converting the distribution system to primarysecondary/ series-tertiary pumping, will enhance the plant capacity to serve future buildings, resolve existing hydronic distribution system problems, improve energy efficiency, reduce maintenance costs, and improve system reliability.


File Size : 1 file , 1.8 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 11
Product Code(s) : D-28738
Published : 2006

History


Related products


Best-Selling Products

An Album of Fluid Motion
Published Date: 05/01/1982