RP-1438 -- Simplified Thermal Model with Experiments to Design Optimized Chilled Ceiling and Displacement Ventilation System PDF

RP-1438 -- Simplified Thermal Model with Experiments to Design Optimized Chilled Ceiling and Displacement Ventilation System PDF

Name:
RP-1438 -- Simplified Thermal Model with Experiments to Design Optimized Chilled Ceiling and Displacement Ventilation System PDF

Published Date:
2009

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$9.6
Need Help?

The basic objective of this work statement was to develop general design charts for sizing the chilled-ceiling and displacement ventilation (CC/DV) system using a simplified plume-multilayer thermal model of the conditioned space. The second objective was to optimize CC/DV system operational parameters against different control strategies to improve system response to transient changes in the load and reduce energy use while maintaining the thermal comfort and indoor air quality. Both the design charts and optimization tool were validated by experimentation.

This final report is separated into five main parts. The first part is a short introduction of literature on design charts for CC/DV system operation. The second part describes the simplified wall-plume-multi-layer model and the descitization scheme. The model is the basis for developing the deign charts. The third part discusses the design charts development, validation by experimentation and 3-D simulations, and an example on how to use the charts for designing the two subsystems of chilled ceiling displacement ventilation.

Zip file containing a PDF of the final report and copies of supporting data and Fortran code, approximately 12 MB.

 

Units: Dual


File Size : 1 file , 12 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 132
Product Code(s) : D-RP-1438
Published : 2009

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138