SA-12-C016 -- What We Have Learned from 20 Years of HVAC System Commissioning PDF

SA-12-C016 -- What We Have Learned from 20 Years of HVAC System Commissioning PDF

Name:
SA-12-C016 -- What We Have Learned from 20 Years of HVAC System Commissioning PDF

Published Date:
2012

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

As most are aware by now ASHRAE Guideline 0 - 2005 states that "the Commissioning Process is a quality-oriented process for achieving, verifying, and documenting that the performance of the facilities, systems, and assemblies meets defined objectives and criteria". After 20 years of providing this service, it is appropriate to look back and identify some of the most beneficial lessons we have learned that can help building designers, owners and operators.

Over the years we have found numerous issues such as missing return air ducts, missing supply and return air duct insulation, misapplied diffusers, misapplied terminal units, and system effect issues. While these are not all that unusual, there have been issues found that have a significant impact on performance and energy consumption.

This paper will identify issues found during the commissioning process that were energy significant, comfort compromising, and most importantly re-occurring. It will also provide resolutions of the issues and the resulting benefits. Many of these issues were found on projects where the commissioning provider was not engaged until construction was almost complete or on retro-commissioning projects. Issues found in these cases are typically profound. Examples include: improper control of return air fans and building pressure; improper use of VAV plenum return air systems; improper designed or installed ducted return air systems; improper cooling coil piping connections; questionable strategies for controlling discharge air pressure in VAV systems; inadequate control of chilled water flow in primary / secondary pumping systems of large campus systems; and improper training of O&M staff.


File Size : 1 file , 500 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 11
Product Code(s) : D-SA-12-C016
Published : 2012

History


Related products


Best-Selling Products

CAN/CSA-ISO/IEC TS 11801-9903:21
Published Date: 10/11/2021
Information technology - Generic cabling systems for customer premises - Part 9903: Matrix modelling of channels and links (ISO/IEC TS 11801-9903:2021, IDT)
$51.9
CAN/CSA-ISO/IEC TS 16085-05
Published Date: 10/01/2005
Information Technology - Software Life Cycle Processes - Risk Management (Adopted ISO/IEC 16085:2004 / IEEE 1540-2001, first edition, 2004-10-01)
$34.5
CAN/CSA-ISO/IEC TS 17961:18 (R2022)
Published Date: 01/01/2018
Information technology - Programming languages, their environments and system software interfaces - C secure coding rules (Adopted ISO/IEC TS 17961:2013, first edition, 2013-11-15, including adopted technical corrigendum 1:2016)
$62.7
CAN/CSA-ISO/IEC TS 18661-5:18 (R2022)
Published Date: 01/01/2018
Information technology - Programming languages, their environments, and system software interfaces - Floating-point extensions for C - Part 5: Supplementary attributes (Adopted ISO/IEC TS 18661-5:2016, first edition, 2016-08-15)
$41.7
CAN/CSA-ISO/IEC TS 19570:20
Published Date: 03/01/2020
Programming Languages - Technical Specification for C++ Extensions for Parallelism (Adopted ISO/IEC TS 19570:2018, second edition, 2018-11)
$51
CAN/CSA-ISO/IEC TS 19608:19
Published Date: 10/01/2019
Guidance for developing security and privacy functional requirements based on ISO/IEC 15408 (Adopted ISO/IEC TS 19608:2018, first edition, 2018-10)
$51