Name:
SE-99-18-3 -- Rehabilitating A Thermal Energy Storage System Through Commissioning PDF
Published Date:
1999
Status:
Active
Publisher:
ASHRAE
A thermal energy storage system was installed in a 37,000 ft 2 hospital in April 1992. The chiller had to be operated every summer during peak demand periods until the authors rehabilitated system through building commissioning in late 1995. This paper presents information about the building systems, commissioning activities, and the measured energy savings.
Units: I-P
| File Size : | 1 file , 160 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 6 |
| Product Code(s) : | D-7474 |
| Published : | 1999 |