Seminar 27 -- Best Practices for Employing VRF Systems PDF

Seminar 27 -- Best Practices for Employing VRF Systems PDF

Name:
Seminar 27 -- Best Practices for Employing VRF Systems PDF

Published Date:
2017

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$15.6
Need Help?

Track: HVAC&R Systems and Equipment
Sponsor: 8.7 Variable Refrigerant Flow (VRF), 7.9 Building Commissioning
Chair: Lee Riback, Member, McKinstry, Dallas, TX
With the increased popularity of Variable Refrigerant Flow systems, it is easy to often overlook the complex nature and nuances of this unique equipment, which may lead to difficulties after acceptance of the systems and equipment. This presentation reviews the best practices of engineers whose involvement spans the full project scope from design through continuous system operation. Lessons learned from various stages of different projects will be discussed to prepare professionals for future work with these systems.

1. Best Practices and Quality Control Considerations for VRF Projects
Bill Artis, Member, Daikin, New York, NY
While the design and installation of Variable Refrigerant Flow systems is not inherently difficult, there are nuances and details specific to these systems that if overlooked can lead to costly repairs, poor comfort control and improper system operation. This seminar discusses methods of mitigating potential issues before they occur and reviews best practices and considerations for equipment design and selection, contract documents, functional testing and installation quality control.

2. Lessons Learned through Commissioning
Thomas Conn, Horizon Engineering Associates, New York, NY
This seminar reviews lessons learned from projects utilizing VRF systems from the perspective of the commissioning agent. The importance of properly commissioning these sophisticated systems, means of identifying and addressing common oversights found in various project stages and developing realistic plans for incorporating commissioning into a projects scope are discussed. Additionally, examples and lessons learned from projects the speaker has personally been involved with are reviewed to further improve the confidence among industry professionals responsible with commissioning these systems.

Presented: June 26, 2017, 11:00 AM-12:00 PM
Run Time
: 60 min.

This is a zip file that consists of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) for each presentation.


File Size : 1 file , 55 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-LB17Sem27
Published : 2017
Units of Measure : Dual

History


Related products


Best-Selling Products

ISEA 101-1996 (R2008)
Published Date: 01/06/1997
Limited-Use and Disposable Coveralls - Size and Labeling Requirements
$3
ISEA 101-2014
Published Date: 07/08/2014
American National Standard for Limited-Use and Disposable Coveralls -- Size and Labeling Requirements
$3
ISEA 102-1990 (R2009)
Published Date: 05/25/1990
American National Standard for Gas Detector Tube Units - Short Term Type for Toxic Gases and Vapors in Working Environments
$3
ISEA 103-2010 Erratum (2011)
Published Date: 09/07/2011
Erratum to American National Standard for Classification and Performance Requirements for Chemical Protective Clothing
Free Download
ISEA 103-2010
Published Date: 09/29/2010
American National Standard for Classification and Performance Requirements for Chemical Protective Clothing
$15.9
ISEA 104-1998 (R2009)
Published Date: 07/13/1998
Air Sampling Devices - Diffusive Type for Toxic Gases and Vapors in Working Environments
$3