Name:
Seminar 40 -- Ground Source Systems Commissioning and Closeout: Unique Issues, Avoiding Fatal Flaws and Ensuring Client Satisfaction PDF
Published Date:
2014
Status:
Active
Publisher:
ASHRAE
This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.
High performance ground source systems require a little tender, loving care (TLC) to properly bring them online and ensure that the system meets the design intent and owner's needs. This process begins during the design phase and continues through construction and start-up. The design team, commissioning agent and general contractor need to be invested and engaged with the project. Attention to detail and communication between the owner, design team, commissioning agent and contractor permits continuous improvement and prevents poor performance and an unhappy client. Properly executed, this will result in a well-tuned building system and a happy client. This seminar addresses some of the to-dos and not-to-dos during the process.
| File Size : | 1 file , 190 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Product Code(s) : | D-SE14Sem40 |
| Published : | 2014 |