Seminar 46 -- If Failure Is Random, Why Does It Happen Quicker When the Budget Is Cut? PDF

Seminar 46 -- If Failure Is Random, Why Does It Happen Quicker When the Budget Is Cut? PDF

Name:
Seminar 46 -- If Failure Is Random, Why Does It Happen Quicker When the Budget Is Cut? PDF

Published Date:
2013

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$15.6
Need Help?

This product is a PDF that contains links to files that consist of PowerPoint slides synchronized with the audio-recording of the speaker (recorded presentation), PDF files of the slides, and audio only (mp3) as noted.

The deterioration of the equipment with age is modeled as a random process; therefore, how can maintenance reduce or have an impact on failures? This seminar discusses interval maintenance, predictive maintenance, corrective maintenance, reactive maintenance, and more.

Real World Cell Tower Maintenance
Matthew Mullen, P.E., Member
Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)

Maintenance Mayhem
Keith H. Reihl, P.E., Member
Product Contains: Slides (pdf), Recorded Presentation, Audio (mp3)


File Size : 1 file , 130 KB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-DA13Sem46
Published : 2013

History


Related products


Best-Selling Products

IAPMO 150-2007
Published Date: 2007
Vacuum Sewage, Grease Waste and/or Condensate Collection Systems
$19.5
IAPMO 2012 Green Plumbing and Mechanical Code Supplement
Published Date: 04/01/2012
2012 Green Plumbing and Mechanical Code Supplement - For Use with All Codes
$18.3
IAPMO /ANSI/CAN/ASSE 1055-2020
Published Date: 2020
Performance Requirements for Chemical Dispensers with Integral Backflow Protection
$13.5
IAPMO /ANSI/CAN/ASSE 1055-2020
Published Date: 2023
Performance Requirements for Chemical Dispensers with Integral Backflow Protection
$13.5
IAPMO /ANSI/CAN/ASSE 1103-2024
Published Date: 2024
Performance Requirements for Pilot Operated Water Pressure Reducing Valves for Potable Water
$13.5
IAPMO /ANSI/CAN/ISO 30500:2019
Published Date: 2019
Non-sewered sanitation systems - Prefabricated integrated treatment units - General safety and performance requirements for design and testing (ISO 30500:2018, IDT)
$66