SL-08-011 -- Hot Water Distribution System Piping Time, Water, and Energy Waste - Phase II Test Results PDF

SL-08-011 -- Hot Water Distribution System Piping Time, Water, and Energy Waste - Phase II Test Results PDF

Name:
SL-08-011 -- Hot Water Distribution System Piping Time, Water, and Energy Waste - Phase II Test Results PDF

Published Date:
2008

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

This paper describes results of recent laboratory tests on common hot water distribution system piping sizes and types under a variety of flow rate, temperature, and environmental conditions. Importantly, buried pipe performance data are presented for the first time. The tests measured the time spent waiting for hot water to arrive at fixtures and the amount of water wasted to drain while waiting. From these, the energy waste associated with the water waste can be computed. Results are presented as plots of the ratio of actual flow volume divided by pipe volume (AF/PV) vs flow rate, temperatures, and other parameters of importance. Several unanticipated flow regimes were observed that dramatically alter behavior from what might be expected based on either plug flow or fully developed flow theory.

Units: Dual

 


File Size : 1 file , 4.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-SL-08-011
Published : 2008

History


Related products


Best-Selling Products