TA-23-C013 – Impact of Crossflow Microsand Filtration on Particle Removal in Cooling Tower Circuit PDF

TA-23-C013 – Impact of Crossflow Microsand Filtration on Particle Removal in Cooling Tower Circuit PDF

Name:
TA-23-C013 – Impact of Crossflow Microsand Filtration on Particle Removal in Cooling Tower Circuit PDF

Published Date:
2023

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

The main objective of the current study is to assess particulate removal efficiency of crossflow filtration system in a HVAC circuit comprising of two plate heat exchangers, one chiller, three cooling towers and a side stream micro-sand filtration unit (CMF). The water quality parameters were measured every two weeks over a period of 7 months (Apr-Oct’22). The physicochemical parameters such as total solids, total suspended solids, total dissolved solids, pH, temperature, dissolved oxygen, turbidity, alkalinity and conductivity were measured at four different points of the circuit namely, inlet water, input of CMF, output of CMF and system purge. Maximum 100% reduction in total suspended solids and 42% reduction in turbidity were observed with an average removal of 27% and 15% respectively. In terms of particle count maximum removal of 94%, 89% and >97% occurs for particles <1 µm, 1-5 µm and 5-100 µm particle count respectively. No Legionella pneumophila were detected. The study highlights the role of industrial crossflow filtration systems towards effective removal of fine particles from the HVAC water circuit.


File Size : 1 file , 4.4 MB
Note : This product is unavailable in Russia, Belarus
Product Code(s) : D-TA-23-C013
Published : 2023

History


Related products


Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
$4.5
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
$4.5
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
Free Download
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
$4.2
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
Free Download
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements
Free Download