Name:
Technical vs. Process Commissioning: Measurement and Verification PDF
Published Date:
2014
Status:
Active
Publisher:
ASHRAE
This article explains the next-to-last step in the technical commissioning process: measurement and verification (M&V). Practically speaking, M&V involves using industry-standard tools and processes to check and ensure that the now-occupied facilities (whether a single building or a group of structures) perform at the owner's expected level of resource efficiency—and what steps you can take if the desired performance level has not been achieved.
| File Size : | 1 file , 180 KB |
| Note : | This product is unavailable in Russia, Belarus |
| Number of Pages : | 6 |
| Product Code(s) : | D-AJ14Aug03 |
| Published : | 2014 |