Technology Award: Reheat for Medical Center PDF

Technology Award: Reheat for Medical Center PDF

Name:
Technology Award: Reheat for Medical Center PDF

Published Date:
2013

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$2.7
Need Help?

The challenge for the design team of the new Aurora Medical Center in Grafton, Wis., was providing a LEED Silver hospital while demonstrating a payback of the additional first cost. The design team targeted areas of highest energy use in standard health-care facilities, including fan energy, reheat, heating/cooling plant energy and lighting and then optimized the savings compared to first cost for a series of energy-efficient options. The result is a building that can be optimized to provide more than $340,000 in annual savings with a simple payback of less than four years.


File Size : 1 file , 520 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 5
Product Code(s) : D-AJ13June04
Published : 2013

History


Related products


Best-Selling Products

PCI 126-15
Published Date: 2015
Manual for the Design of Hollow Core Slabs and Walls
Free Download
PCI 128-19
Published Date: 2019
Specification for Glass-Fiber-Reinforced Concrete Panels
$39.6
PCI 142-24
Published Date: 2024
Specification for Precast, Prestressed Concrete Piles
$39.6
PCI 150-24
Published Date: 2024
Specification for the Design of Precast Concrete Insulated Wall Panels
$39.6
PCI BM-20
Published Date: 2004
Precast Prestressed Concrete Piles - Chapter 20, Bridge Design Manual, Sept. 2004, 1st Edition
$3.3
PCI CB-02-16
Published Date: 2016
Recommended Practice for Lateral Stability of Precast, Prestressed Concrete Bridge Girders
$36.3