PIP PEEPJ003 PDF

PIP PEEPJ003 PDF

Name:
PIP PEEPJ003 PDF

Published Date:
08/01/2024

Status:
Active

Description:

Project Estimating

Publisher:
Process Industry Practices

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$30
Need Help?
This Practice defines the process of initiation and development of cost estimates for projects to ensure consistency and predictability of delivered projects. It provides key elements of the estimating process to enable the project team to deliver an estimate of a quality sufficient to match the agreed expectations between owner and project team. The process outlined covers initiation through establishment of final approved estimate, which becomes the project baseline budget. The cost estimate for a capital project is critically important to all stakeholders. Owners rely on cost estimates to validate the viability of a project’s return on investments through economic analysis. Engineering and construction companies utilize the cost estimate for developing their proposals and negotiating, which are key to securing work and ensuring their profitability. This Practice does not address the subject of cost control of the baselined project budget. The terms “project estimating” and “cost estimating” are used interchangeably.
File Size : 1 file , 470 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 7
Published : 08/01/2024

History


Related products

PIP PCCCV002
Published Date: 02/01/2024
Pressure Regulators Selection Criteria [Technical Revision]
$30
PIP PHCM0004
Published Date: 05/01/2024
Hygienic Valve Commodity Codes Designator System
$30
PIP PHSMV042
Published Date: 01/01/2024
Hygienic for Food/Beverage/Consumer & CGMP Products Plastic Diaphragm Valve Descriptions [Reaffirmation]
$30
PIP PH014SD0E01
Published Date: 04/01/2020
Hygienic Process Material Specification 014SD0E01 316/316L Stainless Steel, C.A. – None, Hygienic Product & Clean In Place Systems SF0 ID Finish, SF0 OD Finish, FKM Seals Hygienic Construction Clamped/Joined Unions [New Practice]
$22.5

Best-Selling Products

CRANE PIPING SYSTEM FUNDAMENTALS
Published Date:
Piping System Fundamentals: The Complete Guide to Gaining a Clear Picture of Your Piping System
$47.1
CRANE TP 410 METRIC
Published Date:
Flow of Fluids: Through Valves, Fittings, and Pipe
CRANE TP 410 U.S.
Published Date:
Flow of Fluids: Through Valves, Fittings, and Pipe