Name:
PIP PLE00009 PDF
Published Date:
05/01/2024
Status:
Active
Publisher:
Process Industry Practices
The purpose of this guideline is to describe when and why potholing is utilized for construction and design activities, potholing methods, advantages and disadvantages of the methods included, and one-call resources. Potholing may be utilized, as required and described herein, to prevent excavation damage to underground utilities and to avoid unknown foreign utilities.
| File Size : | 1 file , 330 KB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 12 |
| Published : | 05/01/2024 |