Name:
PIP RFTF1000 PDF
Published Date:
01/01/2024
Status:
Active
Publisher:
Process Industry Practices
This Practice provides requirements for quality control and quality assurance for the installation of ceramic fiber refractory. Inspection methods include documentation review, in-progress installation inspection, and final inspection of the completed lining.
| File Size : | 1 file , 430 KB |
| Note : | This product is unavailable in Ukraine, Russia, Belarus |
| Number of Pages : | 9 |
| Published : | 01/01/2024 |