AS (RISSB) 7509.4:2009 PDF

AS (RISSB) 7509.4:2009 PDF

Name:
AS (RISSB) 7509.4:2009 PDF

Published Date:
01/01/2009

Status:
Active

Description:

Railway Rolling Stock - Dynamic Behaviour, Part 4: Infrastructure Maintenance Rolling Stock

Publisher:
Rail Industry Safety and Standards Board

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$40.392
Need Help?

Edition : 1st
File Size : 1 file
ISBN(s) : 978073379390
Note : This product is unavailable in Russia, Belarus
Number of Pages : 0
Product Code(s) : 10290312
Published : 01/01/2009

History

AS (RISSB) 7509:2017
Published Date: 06/22/2017
Rolling Stock - Dynamic Behaviour
$30.492
AS (RISSB) 7509.2:2009
Published Date: 01/01/2009
Railway Rolling Stock - Dynamic Behaviour, Part 2: Freight Rolling Stock
$40.392
AS (RISSB) 7509.1:2009
Published Date: 01/01/2009
Railway Rolling Stock - Dynamic Behaviour, Part 1: Locomotive Rolling Stock
$40.392
AS (RISSB) 7509.3:2009
Published Date: 01/01/2009
Railway Rolling Stock - Dynamic Behaviour, Part 3: Passenger Rolling Stock
Free Download
AS (RISSB) 7509.4:2009
Published Date: 01/01/2009
Railway Rolling Stock - Dynamic Behaviour, Part 4: Infrastructure Maintenance Rolling Stock
$40.392

Related products

AS (RISSB) 1085.14:2019
Published Date: 12/02/2019
Railway track material, Part 14: Prestressed concrete sleepers
$49.5
AS (RISSB) 7470:2016
Published Date: 11/21/2016
Human Factors Integration in Engineering Design - General Requirements
$49.5
AS (RISSB) 7632:2015
Published Date: 11/23/2015
Railway Infastructure - Signage
$49.5
AS (RISSB) 7520.3:2012
Published Date: 09/07/2012
Australian Railway Rolling Stock - Body Structural Requirements, Part 3: Passenger Rolling Stock
$49.5

Best-Selling Products