SAE AIR4272A PDF

SAE AIR4272A PDF

Name:
SAE AIR4272A PDF

Published Date:
05/22/2006

Status:
Active

Description:

Power Controllers: Signal Interface Applications and Considerations

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sae-air4272a_1806836

Choose Document Language:
32.40 €
Need Help?
This AIR is applicable to SSPCs, EMPCs, and hybrid power controllers. It covers the control, status, BIT, etc., interfaces, other than electrical power. For the purpose of this document, a power controller shall have, as a minimum, the following characteristics: a. power switching function; b. control input; c. overload protection; and d. status feedback. To accomplish the goals set forth in the foreword, the interfaces are first categorized by function. Next, examples of actual implementations are given.
File Size : 1 file , 11 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 05/22/2006

History


Related products

SAE AS16842A
Published Date: 08/18/2005
Clamp, Wire, Rope, Saddled, Single Grip, Steel
17.10 €
SAE AS116901B
Published Date: 02/23/2012
SCREW – OVAL FILLISTER HEAD, .112-40 (Stabilized: Feb 2012)
14.70 €
SAE AS81659/64B
Published Date: 01/28/2022
CONNECTORS, ELECTRICAL, RECTANGULAR, RECEPTACLE, CRIMP CONTACTS, QUADRUPLE INSERT, TYPE III, CLASS 1(−65 °C TO +125 °C), SERIES 2, SHELL DESIGNATOR A
14.70 €

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
36.00 €
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
36.00 €
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
36.00 €
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
36.00 €
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
36.00 €
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
36.00 €