SAE AIR6364 PDF

SAE AIR6364 PDF

Name:
SAE AIR6364 PDF

Published Date:
11/29/2017

Status:
Active

Description:

Test Facility Shakedown and Commissioning

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$29.4
Need Help?
SAE AIR6364 discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as:
  • the assessment checks prior to forwarding to the end users site for embodiment into the facility system
  • the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks, pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking.
  • the commissioning of the facility such as instrumentation calibrations, engine starts, engine running, assessment of command and control system, assessment of DAS system, aerodynamic and acoustic surveys.

File Size : 1 file , 480 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 11/29/2017

History


Related products

SAE AS25472A
Published Date: 08/20/2014
GAGE, IN-SERVICE-INSPECTION, FOR USE WITH MS25442 CRIMPING DIES (FOR USE WITH ALUMINUM WIRE TERMINALS) (Stabilized: Aug 2014)
$14.7
SAE MA4036A
Published Date: 11/03/2021
Rings, Retaining - Tapered Width, Uniform Thickness Corrosion Resistant, Procurement Specification For, Metric
$30.9
SAE AS3482E
Published Date: 06/08/2020
NUT, SELF-LOCKING, PLATE, SIDE BY SIDE, REDUCED RIVET SPACING, LOW HEIGHT, UNS S66286, CLASS: 125 KSI/800 °F
$12.3

Best-Selling Products

EIMA 99-A-2001
Published Date: 01/01/2001
Exterior Insulation and Finish Systems (EIFS)
$8.4