SAE AMSQQA225/6A PDF

SAE AMSQQA225/6A PDF

Name:
SAE AMSQQA225/6A PDF

Published Date:
05/19/2010

Status:
Active

Description:

Aluminum Alloy, 2024, Bar, Rod, and Wire; Rolled, Drawn, or Cold Finished

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.3
Need Help?
This specification covers the specific requirements for 2024 aluminum alloy bar, rod and wire produced by rolling, drawing or cold finishing.
File Size : 1 file , 290 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 05/19/2010

History

SAE AMSQQA225/6B
Published Date: 03/04/2018
Aluminum Alloy, 2024, Bar, Rod, and Wire; Rolled, Drawn, or Cold Finished (Stabilized: Mar 2018)
$27.6
SAE AMSQQA225/6A
Published Date: 05/19/2010
Aluminum Alloy, 2024, Bar, Rod, and Wire; Rolled, Drawn, or Cold Finished
$18.3

Related products

SAE AMS4347E
Published Date: 08/20/2020
Aluminum Alloy Sheet 1.0Mg - 0.8Si - 0.8Cu - 0.5Mn (6013-T4) Solution Heat Treated and Naturally Aged
$18.9
SAE AMS4231G
Published Date: 02/11/2005
Castings, Sand, 4.5Cu - 1.1Si, Solution and Precipitation Heat Treated
$24.9
SAE AMS4271A
Published Date: 07/25/2013
Aluminum Alloy, Sheet and Plate 4.4Cu - 1.5Mg - 0.60Mn; (2024-T861), Solution Heat Treated and Cold Worked, and Artificially Aged (Stabilized: Jul 2013)
$18.9
SAE AMS2480K
Published Date: 07/23/2024
Zinc Phosphate Treatment Paint Base
$22.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138