SAE ARP5598A PDF

SAE ARP5598A PDF

Name:
SAE ARP5598A PDF

Published Date:
03/01/2021

Status:
Active

Description:

Unauthorized Laser Illuminations: Pilot Operational Procedures (Stabilized: Mar 2021)

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$31.8
Need Help?
This document addresses the operational safety and human factors aspects of unauthorized laser illumination events in navigable airspace. The topics addressed include operational procedures, training, and protocols that flight crew members should follow in the event of a laser exposure. Of particular emphasis, this document outlines coping strategies for use during critical phases of flight. Although lasers are capable of causing retinal damage, most laser cockpit illuminations, to date, has been relatively low in irradiance causing primarily startle reactions, visual glare, flashblindness and afterimages. Permanent eye injuries from unauthorized laser exposures have been extremely rare. This document describes pilot operational procedures in response to the visual disruptions associated with low to moderate laser exposures that pilots are most likely to encounter during flight operations. With education and training, pilots can take actions that safeguard both their vision and the safety of their passengers.

File Size : 1 file , 960 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 03/01/2021

History

SAE ARP5598A
Published Date: 03/01/2021
Unauthorized Laser Illuminations: Pilot Operational Procedures (Stabilized: Mar 2021)
$31.8
SAE ARP5598
Published Date: 11/09/2009
Unauthorized Laser Illuminations: Pilot Operational Procedures
$27.6

Related products

SAE AS3108B
Published Date: 03/09/2020
BOLT, MACHINE - HEXAGON HEAD, DRILLED 1 HOLE, PD SHANK, CRES AMS5731 (UNS S66286), .2500-28 UNJF-3A
$14.7

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36