SAE AS1582F PDF

SAE AS1582F PDF

Name:
SAE AS1582F PDF

Published Date:
04/26/2012

Status:
Active

Description:

FITTING, ADAPTER, EXTERNAL THREAD FLARELESS TO INTEGRAL WELD RING, 3000 PSI

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$14.4
Need Help?
Scope is unavailable.
File Size : 1 file , 110 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 04/26/2012

History

SAE AS1582H
Published Date: 11/15/2023
FITTING, ADAPTER, EXTERNAL THREAD FLARELESS TO INTEGRAL WELD RING, 3000 PSI
$14.7
SAE AS1582G
Published Date: 06/12/2023
FITTING, ADAPTER, EXTERNAL THREAD FLARELESS TO INTEGRAL WELD RING, 3000 PSI
$14.4
SAE AS1582F
Published Date: 04/26/2012
FITTING, ADAPTER, EXTERNAL THREAD FLARELESS TO INTEGRAL WELD RING, 3000 PSI
$14.4
SAE AS 1582E
Published Date: 04/26/2012
Fitting, Adapter, External Thread Flareless to Integral Weld Ring 3000 psi

Related products

SAE AS3496A
Published Date: 01/09/2014
GASKET - TYPE XVI ENGINE ACCESSORY DRIVE (Stabilized: Jan 2014)
$14.7
SAE AS9286C
Published Date: 10/01/2021
BOLT, MACHINE - HEXAGON HEAD, PD SHANK, BLACK OXIDE, STEEL UNS G87400, 125 KSI MIN, .3750-24 UNJF-3A
$14.7
SAE AS81820/1D
Published Date: 07/21/2014
BEARING, PLAIN, SELF-ALIGNING, SELF-LUBRICATING, LINED BORE, LOW SPEED, NARROW, GROOVED RACE, −65 TO +325 °F
$17.1

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138