SAE AS1633E PDF

SAE AS1633E PDF

Name:
SAE AS1633E PDF

Published Date:
05/10/2017

Status:
Active

Description:

HOSE ASSEMBLY, CONVOLUTED, POLYTETRAFLUOROETHYLENE, METALLIC REINFORCED CONDUCTIVE, FLARELESS, STRAIGHT TO STRAIGHT (Stabilized: May 2017)

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$20.7
Need Help?

File Size : 1 file , 280 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 6
Published : 05/10/2017

History

SAE AS1633E
Published Date: 05/10/2017
HOSE ASSEMBLY, CONVOLUTED, POLYTETRAFLUOROETHYLENE, METALLIC REINFORCED CONDUCTIVE, FLARELESS, STRAIGHT TO STRAIGHT (Stabilized: May 2017)
$20.7

Related products

SAE AIR1855A
Published Date: 04/26/2023
Actuation System Data Summary for Missiles and Launch Vehicles
$45.3
SAE AS7108/1B
Published Date: 06/11/2009
National Aerospace and Defense Contractors Accreditation Program Requirements for Painting and Dry Film Coatings
$17.1
SAE AS486B
Published Date: 07/15/1978
Aircraft Circuit Breaker and Fuse Arrangement
$17.1
SAE AS3174B
Published Date: 09/10/2019
BOLT, MACHINE - DOUBLE HEX EXTENDED WASHER HEAD, DRILLED, CLOSE TOL SHANK, AMS5643 (UNS S17400), 140 KSI, .1900-32 UNJF-3A
$14.7

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138