SAE AS21004D PDF

SAE AS21004D PDF

Name:
SAE AS21004D PDF

Published Date:
07/13/2022

Status:
Active

Description:

TERMINAL, LUG, UNINSULATED, RECTANGULAR TONGUE, CRIMP STYLE, COPPER, TYPE I, CLASS 1, FOR 150 °C TOTAL CONDUCTOR TEMPERATURE

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$14.4
Need Help?

File Size : 1 file , 190 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 07/13/2022

History

SAE AS21004F
Published Date: 12/12/2023
TERMINAL, LUG, UNINSULATED, RECTANGULAR TONGUE, CRIMP STYLE, COPPER, TYPE I, CLASS 1, FOR 150 °C TOTAL CONDUCTOR TEMPERATURE (Stabilized: Dec 2023)
$18.9
SAE AS21004E
Published Date: 08/30/2023
TERMINAL, LUG, UNINSULATED, RECTANGULAR TONGUE, CRIMP STYLE, COPPER, TYPE I, CLASS 1, FOR 150 °C TOTAL CONDUCTOR TEMPERATURE
$17.1
SAE AS21004D
Published Date: 07/13/2022
TERMINAL, LUG, UNINSULATED, RECTANGULAR TONGUE, CRIMP STYLE, COPPER, TYPE I, CLASS 1, FOR 150 °C TOTAL CONDUCTOR TEMPERATURE
$14.4
SAE AS21004A
Published Date: 02/13/2014
TERMINAL, LUG, UNINSULATED, RECTANGULAR TONGUE, CRIMP STYLE, COPPER, TYPE I, CLASS 1 FOR 175 °C TOTAL CONDUCTOR TEMPERATURE
$13.2
SAE AS21004
Published Date: 02/13/2002
Terminal, Lug, Uninsulated, Rectangular Tongue, Crimp Style, Copper, Type I, Class 1 for 175°C Total Conductor Temperature
$13.2

Related products

SAE ARP484A
Published Date: 07/01/1994
SPARK IGNITER GAP TYPES
$12.3
SAE AS5202A
Published Date: 01/07/2013
PORT OR FITTING END, INTERNAL STRAIGHT THREAD, DESIGN STANDARD
$27.6
SAE AS81935/4B
Published Date: 06/03/2014
BEARING, PLAIN, ROD END, SELF-ALIGNING, SELF-LUBRICATING, NARROW, EXTERNALLY THREADED, -65 TO +325 °F
$17.1
SAE AS6294/2
Published Date: 04/24/2018
Requirements for Plastic Encapsulated Microcircuits in Military and Avionics Applications
$26.1

Best-Selling Products

NORSOK C-001:2022
Published Date: 03/21/2022
Living quarters area
NORSOK C-004:2019+AC:2022
Published Date: 10/23/2019
Helicopter deck on offshore installations
NORSOK D-002
Published Date: 01/13/2020
Well intervention equipment
NORSOK D-007
Published Date: 03/26/2021
Well testing, clean-up and flowback systems
NORSOK D-010:2021+AC2:2021
Published Date: 12/23/2021
Well integrity in drilling and well operations
NORSOK D-010/AC:2021
Published Date: 06/23/2021
CORRIGENDUM: Well integrity in drilling and well operations