SAE AS5756/5A PDF

SAE AS5756/5A PDF

Name:
SAE AS5756/5A PDF

Published Date:
06/05/2013

Status:
Active

Description:

CABLE, 3-PHASE POWER, ELECTRIC, PORTABLE, MULTICONDUCTOR, 90°C, 600V, OZONE RESISTANT, SPLIT NEUTRAL (Stabilized: Jun 2013)

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$20.7
Need Help?
This document has been declared "Stabilized" and will no longer be subjected to periodic reviews for currency. Users are responsible for verifying references and continued suitability or technical requirements. New technology may exist.
File Size : 1 file , 410 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 06/05/2013

History

SAE AS5756/5A
Published Date: 06/05/2013
CABLE, 3-PHASE POWER, ELECTRIC, PORTABLE, MULTICONDUCTOR, 90°C, 600V, OZONE RESISTANT, SPLIT NEUTRAL (Stabilized: Jun 2013)
$20.7
SAE AS 5756/5
Published Date: 06/01/2004
Cable, 3-Phase Power, Electric, Portable, Multiconductor, 90\mDC, 600V, Ozone Resistant, Split Neutral

Related products

SAE AS5205B
Published Date: 01/07/2013
NUT, FITTING, ENGINE, FLARED
$14.7
SAE AS5259A
Published Date: 07/23/2021
Crimping Tool and Accessories, Electrical, Crimp Barrel Size 8 to 4/0, General Purpose Use
$33.9
SAE AS20708/500B
Published Date: 05/22/2017
Synchro, Torque Receiver, Type 26V-10TR4 (Stabilized: May 2017)
$17.1
SAE AS81824/10
Published Date: 11/21/2018
SPLICE, IN-LINE, ELECTRIC, CRIMP, NI/CU, ENVIRONMENTAL, HEAT-SHRINKABLE SLEEVE (175 °C), 3 × 3 SEALANT OPENING
$17.1

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138