SAE AS9116A PDF

SAE AS9116A PDF

Name:
SAE AS9116A PDF

Published Date:
05/17/2024

Status:
Active

Description:

Aerospace Series - Notice of Change (NOC)

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$39
Need Help?
The aviation, space, and defense industries rely on the development and manufacture of complex products comprised of multiple systems, subsystems, and components each designed by individual designers (design activities) at various levels within the supply chain. Each design or manufacturing activity controls various aspects of the configuration and specifications related to the product. When a change to design or process is requested or required, the change is typically required to be evaluated against the impacts to the entire system.
Proposed changes to design data/information that the design activity identifies to be minor and have no effect on the product requirements or specifications, have the potential to be implemented and approved, where authorized to do so, but requires notification. Changes that affect customer mandated requirements or specifications shall be approved prior to implementation. In many cases, the design activity is not conducted by the DAH or design authority. The design activity may be several layers below the design approval. Irrespective of where the design activity is conducted in the supply chain, notification is required. The typical change notification flow is presented in Figure 1.
Submitting NOC data either electronically or conventionally on paper is subject to the terms and conditions of the customer’s contract. This also includes, where applicable, data access under the regulations of export control.
The process of exchanging, coordinating, and approving NOC data varies with the multiple relationships and agreements among all organizations concerned. An objective of this standard is to provide the definition of a data set that can be integrated into any form of communication (e.g., electronic data interchange, submission of conventional paper forms). A sample form can be found in the Supply Chain Management Handbook (SCMH).
If all or part of this standard is contractually invoked, design organizations and design holders (i.e., the organization responsible for the product end item design) that have responsibility for change management of products used on other higher-level designs shall use the information and processes defined in this standard for submitting change notifications.

File Size : 1 file , 900 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 05/17/2024

History

SAE AS9116A
Published Date: 05/17/2024
Aerospace Series - Notice of Change (NOC)
$39
SAE AS9116
Published Date: 10/30/2014
Aerospace Series - Notice of Change (NOC) Requirements
$38.4

Related products

SAE AIR1667A
Published Date: 04/23/2013
Rotor Blade Electrothermal Ice Protection Design Considerations
$43.8
SAE ARP1587B
Published Date: 09/26/2013
Aircraft Gas Turbine Engine Health Management System Guide
$38.7
SAE AS39029/20B
Published Date: 12/02/2013
CONTACTS, ELECTRICAL CONNECTOR, SOCKET, CRIMP REMOVABLE, SHIELDED (FOR MIL-C-81511 SERIES 3 CONNECTORS) (Stabilized: Dec 2013)
$20.7
SAE AS3507C
Published Date: 07/01/2019
Insert - Thin Wall, Self-Locking Short and Long Length Installation and Removal of (Stabilized: Jul 2019)
$32.4

Best-Selling Products

ISUZU ADHES/SEAL RENEWAL
Published Date: 01/01/2000
ISUZU ADHESIVES/SEALERS RENEWAL
ISUZU COATINGS RENEWAL
Published Date: 01/01/2000
ISUZU COATINGS, PLASTICS & RUBBER RENEWAL
ISUZU COATINGS U02/06
Published Date: 06/01/2002
ISUZU COATINGS UPDATE 02/06
ISUZU COATINGS U03/04
Published Date: 04/01/2003
ISUZU COATINGS UPDATE 03/04
ISUZU FUELS/LUBES RENEWAL
Published Date: 01/01/2000
ISUZU FUELS/LUBES & COOLANT RENEWAL
ISUZU FUELS/LUBES U01/08
Published Date: 08/01/2001
ISUZU FUELS/LUBES UPDATE 01/08