SAE J2277 PDF

SAE J2277 PDF

Name:
SAE J2277 PDF

Published Date:
04/24/2013

Status:
Active

Description:

Shot Peening Coverage Determination

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
This SAE Recommended Practice provides procedures some procedure for determining shot penning coverage and relating coverage to part exposure to the media stream.. Effectiveness of shot peening is directly dependent on coverage. Either incomplete or excessive coverage may be detrimental to fatigue strength and life.
Published : 04/24/2013

History

SAE J2277_202301
Published Date: 01/13/2023
Shot Peening Coverage Determination
$27.6
SAE J2277
Published Date: 04/24/2013
Shot Peening Coverage Determination
SAE J2277_201304
Published Date: 04/24/2013
Shot Peening Coverage Determination
$19.8
SAE J 2277
Published Date: 10/26/2009
Shot Peening Coverage Determination

Related products

SAE AS3068B
Published Date: 09/17/2020
Nut, Self-Locking, Double Hexagon, Reduced Envelope, AMS7251
$14.7
SAE AMS2615G
Published Date: 05/17/2023
Pressure Testing, Hydraulic Pressure as Specified
$18.9
SAE AMS4788C
Published Date: 09/01/2021
Silver Alloy Brazing Filler Metal 50Ag - 28Zn - 20Cu - 2.0Ni 1220 to 1305 °F (660 to 707 °C) Solidus-Liquidus Range
$20.7
SAE AS9138
Published Date: 01/20/2018
Aerospace Series - Quality Management Systems Statistical Product Acceptance Requirements
$48.6

Best-Selling Products

IIAR AMMONIA REFRIGERATION LIBRARY
Published Date: 01/01/2020
Ammonia Refrigeration Library
IIAR AMMONIA REFRIGERATION LIBRARY
Published Date: 01/01/2023
Ammonia Refrigeration Library
$816.9
IIAR ARM-LC GUIDELINES
Published Date:
Low Charge Ammonia Refrigeration Management (ARM-LC) Guidelines
$297
IIAR ARM-LC SUMMARY GUIDE
Published Date:
Low Charge Ammonia Refrigeration Management (ARM-LC) Summary Guide
$148.5
IIAR ARM PROGRAM
Published Date:
ARM-Ammonia Refrigeration Management Program
$544.5
IIAR BULLETIN 110
Published Date: 03/01/2002
Guidelines for: Start-Up, Inspection and Maintenance of Ammonia Mechanical Refrigerating Systems