SAE J2535_201302 PDF

SAE J2535_201302 PDF

Name:
SAE J2535_201302 PDF

Published Date:
02/11/2013

Status:
Active

Description:

Setting Preload in Heavy-Duty Wheel Bearings

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$19.8
Need Help?
This SAE Recommended Practice applies to the four primary, large volume applications in the class 7-8 heavy-duty market place, as specified in SAE J1842: a. "N" trailer axle; b. "R" powered rear axle; c. "FF/FG" nonpowered front axle; and d. "P" trailer axle.

This document applies to on-highway applications. It is not applicable to those applications that exceed the GAWR ratings or the load line restrictions listed in columns "A," "B", and "C" of Table 1. Load lines are measured from the inboard bearing cup backface as shown in 3.4.

This document establishes preload force values only. The methodology to obtain these force values must be determined by the fastener supplier and/or axle assembler.

This document reviews the bearing system. It is NOT intended to prescribe (new or existing) axle and/or hub manufacturers' ratings and/or specifications.
File Size : 1 file , 210 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 02/11/2013

History

SAE J2535_201910
Published Date: 10/07/2019
Setting Preload in Heavy-Duty Wheel Bearings (Stabilized: Oct 2019)
$23.7
SAE J2535_201302
Published Date: 02/11/2013
Setting Preload in Heavy-Duty Wheel Bearings
$19.8

Related products

SAE J184_201408
Published Date: 08/13/2014
Qualifying A Sound Data Acquisition System (Stabilized: Aug 2014)
$33.9
SAE J1099_201808
Published Date: 08/24/2018
Technical Report on Low Cycle Fatigue Properties Ferrous and Non-Ferrous Materials (Stabilized: Aug 2018)
$38.4

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138