SAE J2937_202110 PDF

SAE J2937_202110 PDF

Name:
SAE J2937_202110 PDF

Published Date:
10/08/2021

Status:
Active

Description:

Linear Impact Procedure for Occupant Ejection Protection

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$31.8
Need Help?
The objective of this document is to enhance the test procedure that is used for ejection mitigation testing per the NHTSA guidelines as mentioned in the FMVSS226 Final Rule document (NHTSA Docket No. NHTSA-2011-0004).
The countermeasure for occupant ejection testing is to be tested with an 18kg mass on a guided linear impactor using the featureless headform specifically designed for ejection mitigation testing.
SAE does not endorse any particular countermeasure for ejection mitigation testing. However, the document reflects guidelines that should be followed to maintain consistency in the test results. Examples of currently used countermeasures include the Inflatable Curtain airbags and Laminated Glass.
The testing procedure is as follows:
  1. 1
    Determine the daylight opening
  2. 2
    Identify target locations per the FMVSS226 Final Rule ¿¿5.2
    1. a
      Target locations for all windows and daylight openings
    2. b
      Perform the target elimination process
    3. c
      Reconstitute the targets
  3. 3
    Determine the zero-plane
  4. 4
    In case of advanced glazing, determine if the glazing has to be part of the test and pre-brake it at a 75mm offset
    1. a
      If yes, than follow the procedure for pre-breaking the laminated glazing
  5. 5
    Run the test
    1. a
      At 5.6m/s with a 1.5s delay
    2. b
      At 4.4m/s with a 6.0s delay

File Size : 1 file , 1.2 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 10/08/2021

History

SAE J2937_202110
Published Date: 10/08/2021
Linear Impact Procedure for Occupant Ejection Protection
$31.8

Related products

SAE J2470_200901
Published Date: 01/22/2009
Hydraulic Fluid Power—Valves—Method for Assessing the Lock Sensitivity to Contaminants
$29.4
SAE J343_202310
Published Date: 10/05/2023
Test and Test Procedures for SAE 100R Series Hydraulic Hose and Hose Assemblies
$26.1
SAE J684_201405
Published Date: 05/30/2014
Trailer Couplings, Hitches, and Safety Chains—Automotive Type
$27.6
SAE J470_201802
Published Date: 02/15/2018
Wrought Nickel and Nickel-Related Alloys (Stabilized: Feb 2018)
$33.3

Best-Selling Products

TELCORDIA FR-RTP-1-CD-21-100USERS
Published Date: 02/01/2003
Release to Pivot (RTP) Family of Requirements (RTPFR), FR-RTP-1
TELCORDIA FR-SONET-17-CD-1USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA FR-SONET-17-CD-6-20USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA GR-1009
Published Date: 11/01/1994
Generic Requirements for Fiber Optic Clip-on Test Sets
TELCORDIA GR-1031
Published Date: 10/01/1997
OTGR Section 15.6: Operations Interfaces Using OSI Tools: Test Access Management
TELCORDIA GR-1042
Published Date: 12/01/1998
Generic Requirements for Operations Interfaces Using OSI Tools - Information Model Overview: Synchronous Optical Network (SONET) Transport Information Model