SCTE 238 2017 PDF

SCTE 238 2017 PDF

Name:
SCTE 238 2017 PDF

Published Date:
2017

Status:
Active

Description:

Operational Practice for Measuring and Baselining Power Consumption in Outside Plant Equipment and Power Supplies

Publisher:
Society of Cable Telecommunication Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
This operational practice covers techniques for measuring the energy consumption of outside plant (OSP) equipment, including power supplies, fiber optic nodes, RF amplifiers and other active electronic devices in the outside plant. Methods apply to modern equipment with built-in metering and to un-metered legacy equipment, and some of the latter may be intrusive and service impacting.

This operational practice is to help cable operators determine the actual energy consumption of current and newer OSP devices as they are deployed in the field in order to 1) develop energy monitoring and management practices to improve energy efficiency in the OSP, and 2) to understand where improvements in next generation access network equipment are needed to achieve further improvements in energy efficiency.

ANSI/SCTE 211 2015 [3] describes energy metrics for access networks, and ANSI/SCTE 212 2015 [2] describes an overall framework for performing energy audits and establishing baseline energy consumption in cable access networks. However, even with the ANSI/SCTE 212 2015 [2] framework, portions of cable networks do not easily lend themselves to exact measurement and monitoring of energy consumption due to the lack throughout the network of certified utility metering and/or modern monitoring solutions built into the power supplies. This document thus provides specific operational practices in support of the ANSI/SCTE 212 2015 [2] standard for defining how cable operators can audit power consumption and accurately establish an energy baseline in access networks as they currently exist. This document is limited to the outside plant equipment and excludes any customer powered equipment. Inside plant, i.e. equipment located in critical facilities at the network edge, should be covered in a separate operational practice document.
File Size : 1 file , 2.4 MB
Number of Pages : 36
Published : 2017

History


Related products

SCTE 24-12 2016 (R2022)
Published Date: 2022
IPCablecom 1.0 Part 12: Trunking Gateway Control Protocol (TGCP)
$7.5
SCTE 30 2021
Published Date: 2021
Digital Program Insertion Splicing API
$7.5
SCTE 153 2021
Published Date: 2021
Drop Passives: Splitters, Couplers and Power Inserters
$7.5
SCTE 144 2023
Published Date: 2023
Test Procedure for Measuring Transmission and Reflection
$7.5

Best-Selling Products

Directory Test
Published Date: 06/15/2021