SCTE 260-2 2020 PDF

SCTE 260-2 2020 PDF

Name:
SCTE 260-2 2020 PDF

Published Date:
2020

Status:
Active

Description:

DPoE IP Network Element Requirements

Publisher:
Society of Cable Telecommunication Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
scte-260-2-2020_2216973

Choose Document Language:
7.50 €
Need Help?
As the name suggests, the scope for this document is the MAC and upper layer protocols for DPoE Networks. The MAC in DPoE Networks is EPON. This specification does not place any additional requirements on the EPON MAC beyond the [802.3] specifications for EPON. The first set of requirements is for the support of DOCSIS-based Operations Administration Maintenance and Provisioning (OAMP) for the MAC and upper layer protocols as specified in [MULPIv3.0]. The second set of requirements is in addition to the above functionality traffic classification (as provisioned) and traffic forwarding (as both provisioned and according to the requirements set forth in this specification).
File Size : 1 file , 160 KB
Number of Pages : 5
Published : 2020

History


Related products

SCTE 81 2012
Published Date: 09/01/2012
Surge Withstand Test Procedure
7.50 €
SCTE 109 2024
Published Date: 2024
Test Procedure for Common Path Distortion (CPD)
7.50 €
SCTE 161 2022
Published Date: 2022
Drop Amplifiers
7.50 €
SCTE 177 2018 (R2024)
Published Date: 2024
Specification for Braided 75 Ω, Mini-Series Quad Shield Coaxial Cable for CMTS and SDI Cables
7.50 €

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
36.00 €
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
36.00 €
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
36.00 €
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
36.00 €
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
36.00 €
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
36.00 €