SCTE 29 2001 PDF

SCTE 29 2001 PDF

Name:
SCTE 29 2001 PDF

Published Date:
01/01/2001

Status:
Active

Description:

Torque Requirements for Bond Wire Penetration of Bonding Set Screw, (formerly IPS TP 215)

Publisher:
Society of Cable Telecommunication Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
This test procedure is to determine the mechanical force needed to penetrate bonding wire to the appropriate depth. Bonding wire penetration should be less than 25% of wire O.D.
ANSI : ANSI Approved
File Size : 1 file , 81 KB
Number of Pages : 5
Published : 01/01/2001

History

SCTE 29 2018 (R2024)
Published Date: 2018
Torque Requirements for Bond Wire Penetration of Bonding Set Screw
$7.5
SCTE 29 2012
Published Date: 10/23/2012
Torque Requirements for Bond Wire Penetration of Bonding Set Screw
$7.5
SCTE 29 2007
Published Date: 01/01/2007
Torque Requirements for Bond Wire Penetration of Bonding Set Screw
$7.5
SCTE 29 2001
Published Date: 01/01/2001
Torque Requirements for Bond Wire Penetration of Bonding Set Screw, (formerly IPS TP 215)
$7.5

Related products

SCTE 24-16 2007
Published Date: 01/01/2007
IPCablecom Management Event Mechanism, (formerly DSS 02-13)
$7.5
SCTE 95 2018 (R2024)
Published Date: 2024
HMS Inside Plant HMTS Theory of Operation
$7.5
SCTE 104 2023
Published Date: 2023
Automation System to Compression System Communications Applications Program Interface (API)
$7.5
SCTE 262-3 2020
Published Date: 2020
DOCSIS 4.0 Part 3: Cable Modem Operations Support System Interface Specification
$7.5

Best-Selling Products

ICAC EP-7
Published Date: 01/01/2004
ELECTROSTATIC PRECIPITATOR GAS FLOW MODEL STUDIES
ICAC EP-8
Published Date: 11/01/1993
Structural Design Criteria for Electrostatic Precipitator Casings
ICAC F-3
Published Date: 01/01/2002
Operation and Maintenance of Fabric Collectors
ICAC WP-1
Published Date: 05/01/2009
White Paper: Selective Catalytic Reduction (SCR) Controls for NO x Emissions from Fossil Fuel-Fired Electric Power Plants