Name:
SCTE 73 2007 PDF
Published Date:
01/01/2007
Status:
Active
Publisher:
Society of Cable Telecommunication Engineers
Because this performance parameter involves, and is influenced by, two separate and distinct components (connector and cables) it is desirable to create a unified procedure to evaluate each for its individual contribution to the total interface. This procedure will, therefore, necessarily diverge into two alternate paths at the appropriate junctures. One path will assume the establishment and use of a "standard test connector" to be used in the measurement of installation force(s) required for connectorization of various cables. The other path will assume the establishment and use of a "standard test cable" to be used to measure the installation force(s) required for proper seating of various connectors. For either situation, the resulting measurements should only be used for comparison between the cables versus the "standard test connector" or the connectors versus the "standard test cable."
| ANSI : | ANSI Approved |
| File Size : | 1 file , 150 KB |
| Number of Pages : | 9 |
| Published : | 01/01/2007 |