SME IQ900771 PDF

SME IQ900771 PDF

Name:
SME IQ900771 PDF

Published Date:
06/01/1990

Status:
Active

Description:

Implementing Continuous Flow Manufacturing

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
sme-iq900771_919456

Choose Document Language:
0
Need Help?
AMERICAN INDUSTRY HAS BEEN SLOW TO WIDELY IMPLEMENT JIT CONCEPTS DUE TO THE LACK OF A CONSISTENT, ANALYTICAL APPROACH TO CORPORATE-WIDE IMPLEMENTATION. CONTINUOUS FLOW MANUFACTURING (CFM), AN APPLICATION OF TQM ON THE SHOP FLOOR, APPLIES AN ANALYTICAL APPROACH FOCUSING ON THE REDUCTION OF MANUFACTURING CYCLE TIME, THE CRITICAL MEASURE OF PLANT EFFECTIVENESS. FAST MANUFACTURING CYCLE TIME LEADS TO LOWER WORK-IN-PROCESS INVENTORY, QUICKER DELIVERY TIMES, FASTER DEMING CYCLES, LOWER COSTS, AND HIGHER QUALITY. CFM IMPLEMENTATIONS RELY ON FOUR IMPROVEMENT METHODS: SETUP REDUCTION, DEFECT PREVENTION, OPERATION TIME IMPROVEMENT, AND PROCESS FLOW IMPROVEMENT.
Number of Pages : 8
Published : 06/01/1990

History


Related products


Best-Selling Products

IIAR AMMONIA REFRIGERATION LIBRARY
Published Date: 01/01/2020
Ammonia Refrigeration Library
IIAR AMMONIA REFRIGERATION LIBRARY
Published Date: 01/01/2023
Ammonia Refrigeration Library
816.90 €
IIAR ARM-LC GUIDELINES
Published Date:
Low Charge Ammonia Refrigeration Management (ARM-LC) Guidelines
297.00 €
IIAR ARM-LC SUMMARY GUIDE
Published Date:
Low Charge Ammonia Refrigeration Management (ARM-LC) Summary Guide
148.50 €
IIAR ARM PROGRAM
Published Date:
ARM-Ammonia Refrigeration Management Program
544.50 €
IIAR BULLETIN 110
Published Date: 03/01/2002
Guidelines for: Start-Up, Inspection and Maintenance of Ammonia Mechanical Refrigerating Systems