SME IQ910282 PDF

SME IQ910282 PDF

Name:
SME IQ910282 PDF

Published Date:
06/01/1991

Status:
Active

Description:

Total Quality Monitoring By Inference

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
IT IS NOW POSSIBLE TO MONITOR THE FORCES INVOLVED IN A HIGH-SPEED METAL FORMING (STAMPING) OPERATION MUCH THE WAY TEMPERATURES AND PRESSURES ARE MONITORED IN CONTINUOUS PROCESSES. BY MEASURING THE PROCESS IN REAL TIME RATHER THAN CHECKING THE PRODUCT AFTER MANUFACTURE MANY TYPES OF DEFECTS CAN BE DETECTED THE MOMENT THEY OCCUR. MORE IMPORTANTLY, MONITORING THE PROCESS PROVIDES INFORMATION THAT CAN IMPROVE THE PROCESS AND DETECT PROBLEMS BEFORE DEFECTIVE PRODUCTS ARE PRODUCED. IMPLEMENTATION ON THE PRODUCT FLOOR REQUIRES CAREFUL PLANNING, EXTENSIVE COMMUNICATION, AND COMPROMISE, BUT THE RESULTS CAN BE IMPRESSIVE.
Number of Pages : 6
Published : 06/01/1991

History


Related products


Best-Selling Products

BNAE RC.AERO 000 25
Published Date: 03/01/1956
REGISTRE INDIVIDUEL DE CONTROLE--DISPOSITIONS GENERALES
$12.9
BNAE RC.AERO 001 50-B
Published Date: 09/01/1996
Marques de contrôle technique et de qualification d'opérateurs (ancienne définition)
$12.3
BNAE RC.AERO 001 60-A
Published Date: 11/01/1992
PROCEDURE DE DEROGATION A LA CONFIGURATION APPLICABLE
$17.7
BNAE RC.AERO 050 10-A
Published Date: 07/01/1971
RIVETAGES EN ALLIAGE D'ALUMINIUM
$17.7
BNAE RC.AERO 050 20-A
Published Date: 06/01/1969
EMBREVEMENT A CHAUD DES ALLIAGES D'ALUMINIUM
$23.4
BNAE RC.AERO 543 35
Published Date: 02/01/1974
Règles d'utilisation des bancs automatiques d'essais sur câblages électriques
$12.3