TUBE MILL ALIGNMENT AND SETUP AND MILL BASES ARE DISCUSSED. AN ENTRY GUIDE SYSTEM IS PRESENTED. ONCE A MILL IS UP AND RUNNING, FREQUENT CHECKS SHOULD BE MADE TO ENSURE THAT SIZES ARE MAINTAINED AT EVERY PASS AND THE STRIP IS WORKED EVENLY. EXTENDED TOOLING LIFE AND CONTINUOUS PRODUCTION OF HIGH QUALITY TUBING WILL RESULT.