SME MF95-119 PDF

SME MF95-119 PDF

Name:
SME MF95-119 PDF

Published Date:
06/01/1995

Status:
Active

Description:

Tube And Pipe Mill Entry Equipment And Configurations

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
THIS PAPER COVERS THE STORAGE AND HANDLING OF STEEL COILS BEFORE ENTERING THE MILL, THE METHODS OF LOADING COILS ONTO THE UNCOILER AND THE DIFFERENT UNCOILER CONFIGURATIONS AND HOW THEY RELATE TO MILL PERFORMANCE. IT DESCRIBES THE VARIOUS PARTS AND FUNCTIONS OF THE UNCOILER, THE COIL RETAINERS OPERATIONS, THE APPLICATIONS AND OPERATION OF PEELER HOLD DOWN ROLLS, THE FUNCTIONS OF A FLATTENER AND THE GRID SYSTEM TYPE INSTALLATIONS CONCEPT AND APPLICATIONS.
Number of Pages : 7
Published : 06/01/1995

History


Related products


Best-Selling Products

CTI 105-ATC (00)
Published Date: 02/01/2000
CTI Code Tower Standard Specifications for Acceptance Test Code for Water Cooling Towers
$31.2
CTI 105 S (11)
Published Date: 07/01/2011
Supplement to CTI Code Tower Standard Specifications for Acceptance Test Code for Closed Circuit Cooling Towers
$10.5
CTI 105 S (96)
Published Date: 07/01/1996
CTI Code Tower Standard Specifications for Acceptance Test Code for Closed Circuit Cooling Towers
$10.5
CTI 106-ATC (04)
Published Date: 07/01/2004
Acceptance Test Code for Mechanical Draft Evaporative Vapor Condensers
$10.5
CTI ATC-105 (19)
Published Date: 02/01/2019
Acceptance Test Code For Cooling Towers
$37.5
CTI ATC-106 (11)
Published Date: 07/01/2011
Acceptance Test Code for Mechanical Draft Evaporative Vapor Condensers
$7.5